Berkshire House, Maidenhead

Data and Wireless installations where contracted to supply, install, terminate and test, seventy-one Category 6A, U/FTP data, TV and wireless outlets throughout a 14-storey office block converted into flats, in Maidenhead.

Berkshire House Project
Data and Wireless installed two communication cabinets one in the basement and one on the fourteenth floor. The cabinets have been connected using an 8 core, OM3 fibre optic cable which was terminated onto LC fibre optic panels in both cabinets.

The order was received on 30th April. First fix installation of the structured and fibre optic cables was finished on the 17th May.

Final termination and testing was completed within the allocated time frame for our client by Friday 26th May